新沭河三洋港挡潮闸下游引河设计及回淤研究
申霞,洪大林,姬昌辉,谢瑞,王钧
1.南京水利科学研究院;2.江苏省水利勘测设计研究院有限公司
摘要:
通过平面二维水沙数学模型,论证三洋港挡潮闸闸下引河的开挖型式,计算引河开挖后泥沙冲淤量及对行洪的影响.结果表明:闸下开挖一条宽120 m,底高程-3.5 m的引河不能满足行洪6 400 m3/s的要求.通过分析滩地糙率的敏感性,对比不同开挖长度和高程的引河的行洪计算结果,最终确定闸下引河开挖型式为与闸室等宽、长度2.2 km,左侧底高程-1.0 m,右侧0 m的方案.引河开挖后,遇枯、中、丰水年,闸下泥沙淤积量分别为181 000,121 000和36 000 m3.连续3个枯水年,闸下累积淤积量约50万m3,遇设计流量时三洋港闸下水位抬高0.12 m,当淤积量超过此时累积淤积量,闸下需进行清淤,以确保行洪的安全.
关键词:  引河开挖方案  敏感性分析  典型年  清淤时机
DOI:
分类号:TV856; TV148.1
基金项目:水利部公益性行业科研专项基金(201301068);江苏省水利科技基金(2011041)
Design analysis of approach channel and sedimentation at Sanyanggang floodgate on the Xinshu River estuary
SHEN Xia1, HONG Da-lin1, JI Chang-hui1, XIE Rui2, WANG Jun3
1.Nanjing Hydraulic Research Institute;2.Jiangsu Surveying and Design Institute of Water Resources Co., Ltd.;3.Key Laboratory of Disaster Prevention and Reduction, Zhejiang Institute of Hydraulics & Estuary
Abstract:
A 2D numerical model is used to simulate flood level in the demonstration of an approach channel excavation scheme and its sedimentation after excavation of the Sanyanggang floodgate. Research results show that the channel having 120 m in width and -3.5 m in elevation depth can not fit the flow of 6 400 m3/s. Beach roughness sensitivity is analyzed, and several excavation schemes of the downstream approach channel with different lengths and elevations are calculated in this paper. According to the results above, a proper excavation scheme is: width equal to lock chamber, length of 2.2 km, the left beach elevation of -1.0 m, and the right of 0 m. Amounts of sediment in the downstream channel in three typical years of being dry, normal and wet are 181,000 cubic meters, 121,000 cubic meters and 36,000 cubic meters. If three continuous years are dry, the siltation volume is about 500,000 cubic meters. In this condition, water level will rise by 0.12 m when encountering flood discharge of 6 400 m3/s. In this moment, sediment dredging is necessary.
Key words:  excavation scheme of an approach channel  sensitivity analysis  typical year  dredging opportunity