摘要: |
宝钢马迹山港扩建卸船码头涨潮时水流与码头前沿存在20°左右夹角.对船舶靠泊有较大影响.通过物理模型试验,比较分析了多个方案的整治效果,结果表明,设置一定长度的导流堤可有效改善扩建卸船码头前水流流态,并推荐东导流堤150 m方案.推荐方案实施后,现场水文测量资料分析表明,工程实施后的水流流态与模型试验结果完全一致,明显改善了扩建卸船码头前沿的水流条件,涨潮时水流与码头前沿夹角平均为5°~10°,基本归顺了码头前沿水流. |
关键词: 物理模型试验 导流堤 水流流态 马迹山港 卸船码头 |
DOI: |
分类号:U652.3 |
基金项目:国家自然科学基金资助项目 |
|
Analyses on flow condition along extended Majishan unloading harbor in Bao Steel |
CUI Zheng,XU Xiao,SHE Xiao-jian,MAO Ning,ZHANG Lei
|
CUI Zheng,XU Xiao,SHE Xiao-jian,MAO Ning,ZHANG Lei(Nanjing Hydraulic Research Institute,Nanjing 210029,China)
|
Abstract: |
There is a angle of about 20 degrees between the port and the flood flow along the extended Majishan unloading harbor in Bao Steel,which affects the berthing of ships.Based on the physical model experiments of several projects,the diversion dike arranged will improve the tidal current along the unloading harbor,and the project of 150 m-long east-diversion dike is thus suggested.Analysis of the local data measured shows that the flow condition keeps consistent with the result of the physical model after the ... |
Key words: physical model experiment diversion dike tidal current Majishan harbor unloading port |