摘要:
河堤窝崩发生后,首先需要确定的是抢护治理方案,减缓窝塘流速,遏制窝塘进一步发展。在诸多抢护治理方案中,树头石方案具有较好的减速促淤效果而获得较多的应用,但树头高度和抛投间距在以往的设计中都是依经验确定,缺乏理论基础和试验依据。通过制作长江扬中河段指南村窝崩模型,在窝崩口门附近流速模拟相似的基础上,对窝塘内同一高度三种间距的树头石排列型式和同一间距三种高度的树头石进行了试验,用三点法测量了窝塘内12个点的流速、流向。试验结果表明,窝塘内表层流速受惯性影响较大,底层流速受地形影响较大;窝塘内布置不同高度和不同间距的树头石时,平均流速随树头石高度的增加而减小,随树头石间距的增小而减小,窝内流速的减小,意味着泥沙淤积强度的增大;另一方面,树头石高度的增大和间距的减小,都会增加工程的投资成本,研究认为在相对树高为0.15、间距为6m×6m时综合效果较佳。
关键词:  长江河堤  窝崩治理  树头石  平均流速
DOI:
分类号:TV148?????
基金项目:国家自然科学基金项目(面上项目,重点项目,重大项目)
Experimental study on the water blocking effect of tree head–stone in the treatment of pit collapse at the Yangzhong reach of Yangtze river
yuanwenxiu1, yingqiang2, luolonghong1, zhangxingnong2
1.Water Resource Engineering Planning Office of Jiangsu Province;2.Nanjing Hydraulic Research Institute
Abstract:
An effective emergency treatment for the pit collapse is vital to slow down the flow velocity of the pit pond and prevent the further development of the pit pond. The scheme of tree head-stone has been widely used in engineering application owing to the capacity of promoting siltation. The height and spacing distance of tree head-stone were generally determined by engineering experience, and these empirical values were short of theoretical and experimental basis. The arrangements of tree head-stone in pit collapse were tested using the physical model at Zhinan village, Yangzhong embankment of the Yangtze River. In this study, three heights and three spacing distances were orthogonally combined in testing scheme, and the flow direction and velocity were measured at 12 locations using the three point method. Based on the analysis of the experimental results, the surface velocity was greatly affected by inertia, and the bottom velocity was dominantly controlled by the topography of riverbed. In comparison of the experiments with different height and spacing distance, the mean flow velocity increased with the spacing distance of stone, but decreased with the increasing height of tree head. The resulted low flow velocity increased the possibility of siltation. Because the investment cost would increase with the high height of tree head and the low spacing distance of stone, the best relative height of tree head and spacing distance of stone were 0.15 and 6m×6m, respectively.
Key words:  Yangtze River embankment  pit collapse treatment  tree head–stone  mean flow velocity