“75·8” 典型溃坝洪水情景推演及生命损失风险评估
张安琪1, 梅超1, 刘家宏1, 宋天旭1, 张克寒1, 陈邦慧2, 贾仰文1
1.中国水利水电科学研究院 流域水循环与水安全全国重点实验室;2.淮河水利委员会水文局信息中心
摘要:
全球气候变化背景下,极端暴雨引发的流域超标准洪水风险上升,开展极端条件下溃坝洪水情景推演是洪水风险管理的重要手段。以1975年 “75·8” 板桥水库溃坝事件为例,开展典型溃坝洪水情景推演及生命损失风险评估。将历史溃坝流量过程作为入流边界,结合现状地形和土地利用数据构建了二维水动力模型,开展板桥水库单库溃决洪水情景推演,结合人口数据,基于Graham法评估了不同警报时间与公众理解程度组合情景下的潜在生命损失。结果表明:水库大坝溃决后1-3 h沿坝址下游主传播通道快速推进,12-24 h进入平原区域,72 h淹没范围基本稳定;最大水深和最大流速均呈沿主传播通道向下游逐渐衰减的空间分布特征;现状经济社会条件下,研究区洪水暴露人口约67.21万人;不同警报时间与公众理解程度组合情景下,潜在生命损失约为0.02万-9.30万人,且随警报时间增加和公众理解程度提高而降低;以相同公众理解程度下的无警报情景为基准,充分警报情景下潜在生命损失最大减损率可达99.28%。研究成果可为极端条件下溃坝洪水风险识别、生命损失评估以及防洪预案制定提供一定科学参考。
关键词:  溃坝洪水  二维水动力模拟  洪水严重性  人口暴露  生命损失评估
DOI:
分类号:TV122????????
基金项目:国家重点研发计划项目(2024YFC3212800)与国家自然科学基金项目(52192671)共同资助
Scenario Simulation and Loss-of-Life Risk Assessment of the Typical “75·8” Dam-Break Flood
ZHANG Anqi1, MEI Chao1, LIU Jiahong1, SONG Tianxu1, ZHANG Kehan1, CHEN Banghui2, JIA Yangwen1
1.State Key Laboratory of Simulation and Regulation of Water Cycle in River Basin,China Institute of Water Resources and Hydropower Research;2.Hydrological Bureau Information Center of Huaihe River Commission
Abstract:
Against the background of global climate change, the risk of basin-scale floods exceeding design standards due to extreme rainfall is increasing, and scenario simulation of dam-break floods under extreme conditions is an important tool for flood risk management. Taking the 1975 “75·8” Banqiao Reservoir dam-break event as a case, the historical dam-break outflow hydrograph was used as the inflow boundary, and a two-dimensional hydrodynamic model was established using present-day topographic and land-use data to simulate a single-reservoir dam-break flood scenario. Population distribution data were then integrated, and the Graham method was applied to estimate potential loss of life under different combinations of warning time and public understanding. The results show that, after dam failure, the flood propagated rapidly along the main downstream pathway within 1–3 h, entered the middle and lower floodplain within 12–24 h, and the inundation extent became essentially stable by 72 h. Maximum water depth and maximum flow velocity generally decreased downstream along the main flood-propagation pathway. Approximately 672,100 people in the study area were exposed to flooding. Under the different combinations of warning time and public understanding, the estimated potential loss of life ranged from approximately 0.02 × 10? to 9.30 × 10? people and decreased with longer warning time and improved public understanding. Taking the no-warning scenario under the same level of public understanding as the baseline, the maximum reduction in potential loss of life under the sufficient-warning scenario reached 99.28%. The results may provide a scientific reference for dam-break flood risk identification, loss-of-life assessment, and emergency planning under extreme conditions.
Key words:  dam-break flood  two-dimensional hydrodynamic simulation  flood severity  population exposure  loss of life assessment