| 摘要: |
| 针对漓江枯水期补水中长期风险识别与短临预案生成脱节、河道内外需水独立评价问题,构建水库群双尺度补水调度方法。中长期基于逐日水量平衡,以桂林—阳朔双断面递进机制识别缺水风险;短临在小时尺度耦合水库可调水量、马斯京根演进、电站调蓄及河道外用水扣减,引入效益驱动节水与公平分担机制,采用差分进化求解预案;两者映射至预报、预警、预演、预案 4 环节,设置 4 组补水实验。推荐预案下泄 82.8 m³/s 使河道内外需水满足率均达 100.0%,较最大允许下泄节水 51.9%;复合压力下固定预案的桂林站满足率降至 36.8%,经适应性调整可恢复至 100.0%,但节水空间随压力增强而收窄。结果表明,双尺度耦合可贯通保障能力识别与短临预案生成;最大允许下泄宜作为保障上界而非常规方案,短临预案应随水文—需水条件滚动更新;补水效率决定保障边界;公平分担虽非最省水,但可控制库群消耗结构,为后续调度保留余地。成果可为漓江水资源调配"四预"业务及同类城市型、旅游型河流枯水期生态补水调度提供参考。 |
| 关键词: 漓江补水 生态航运需水 双尺度调度 四预业务 短临补水 水库群联合调度 |
| DOI: |
| 分类号: |
| 基金项目:“尖锋”行动计划(广西重大专项计划)(桂科JF2503980041);广西重点研发计划项目(桂科AB24010040) |
|
| A Dual-Scale Reservoir-System Dispatching Method for the Ecological and Navigational Water Demand of the Lijiang River |
|
hu tengfei,zhang yongfeng,chennuo,chen liangang,chen liming,tang jibin,su zhong
|
|
1.Nanjing Hydraulic Research Institute;2.Guilin Municipal Water Resources and Electric Power Survey Design Institute;3.Zhejiang Design Institute of Water Conservancy and Hydroelectric Power;4.Guilin Hydrological Center of Guangxi Zhuang Autonomous Region
|
| Abstract: |
| Dry-season water replenishment of the Lijiang River is not merely a matter of increasing reservoir releases: the river simultaneously sustains the ecological baseline of Guilin, its landscape and tourism-navigation corridor, and a set of off-channel municipal and irrigation intakes. Existing studies have addressed multi-reservoir optimization, ecological operation and replenishment-flow routing separately, so that medium- to long-term identification of guarantee capacity and short-range formulation of executable operation plans remain disconnected, while in-channel and off-channel demands are usually evaluated in isolation. This study therefore defines dry-season replenishment as a dual-scale multi-reservoir operation problem oriented to ecological and navigational water demand, and develops a coupled model that links a daily medium- to long-term guarantee-capacity analysis with an hourly short-range replenishment simulation and operation-plan generation module, both mapped onto the four operational procedures of forecasting, early warning, scenario simulation and operation-plan formulation (the "four-stage", or si yu 四预, workflow adopted in Chinese digital-twin river basins). The medium- to long-term model performs a daily water balance for each reservoir, separates the baseline release governed by ecological-flow and minimum power-generation rules from active replenishment, and identifies deficits through a sequential guarantee scheme in which the Guilin section is secured first and the residual deficit at the Yangshuo section is then computed after deducting the routed contribution of the Guilin replenishment, thereby avoiding double counting between the two sections. The short-range model first identifies the adjustable storage of each reservoir dynamically, so that reservoirs whose effective storage cannot even cover the baseline release over the operation horizon are excluded from the decision space and participate only as simulated boundaries; it then couples Muskingum flow routing along a table-driven river network, regulation by the Shuangtan hydropower station, and threshold-based off-channel withdrawal, so that only the flow actually attainable at a control section after propagation, efficiency loss, withdrawal deduction and engineering regulation is used to judge compliance. A benefit-driven trigger compares the baseline-release scenario with the maximum-permissible-release scenario and starts optimization only when replenishment yields a real gain in guarantee performance; the optimization then minimizes the total planned release subject to no loss of guarantee performance relative to the maximum-release reference and to a consistency constraint between each reservoir''s release share and its effective-storage share, and is solved by an improved differential evolution algorithm. Four numerical experiments were carried out for the Qingshitan, Xiaorongjiang, Chuanjiang and Fuzikou reservoirs, with the Si''anjiang reservoir held at dead storage.
Under the baseline condition, the recommended plan achieved 100.0% satisfaction for both in-channel and off-channel demand with a total planned release of 82.8 m³/s, a 51.9% reduction relative to the maximum permissible release of 171.9 m³/s, whereas baseline release alone (27.0 m³/s) satisfied only 15.7% of the in-channel demand at Guilin. Under compound pressure, with inflow reduced by 20%–40% and demand increased by 20%–30%, the fixed plan degraded progressively to 58.0%, 47.0% and 36.8%; adaptive operation adjustment restored satisfaction to 100.0% in every case, with total releases of 122.9, 129.7 and 165.7 m³/s, but the attainable reduction contracted systematically from 50.9% under the baseline to 28.5%, 24.5% and finally 3.6%, showing that the adaptive capacity of short-range operation is finite rather than unlimited. When the replenishment-efficiency coefficient fell to 0.75, even the maximum permissible release satisfied only 99.7% of the in-channel demand, and the adaptive solution degenerated into the maximum-release solution itself, the two coinciding in both decision variables and guarantee results; 100.0% satisfaction was recovered at 0.80, locating the guarantee threshold between 0.75 and 0.80. In the mechanism test, the fairness-sharing scheme (129.7 m³/s, 24.5% reduction) was not the most water-saving option, yet its release concentration of 0.474 and maximum reservoir drawdown of 3.25 m were markedly more favourable than those of the single-reservoir-priority schemes, whose concentration reached 0.672 or whose drawdown reached 4.25 m, equal to that of the maximum-release scheme.
These results indicate that dual-scale coupling can bridge guarantee-capacity identification and short-range plan generation; that the maximum permissible release should be treated as an upper bound of guarantee capacity rather than a routine operating rule, and short-range plans should be updated on a rolling basis with hydrological and demand conditions; that replenishment efficiency is the key sensitive parameter governing the attainable guarantee limit; and that the value of fairness sharing lies in controlling the consumption structure of the reservoir system and preserving regulation capacity for subsequent operations, rather than in minimizing the release of the current cycle. The method provides model support for the four-stage water-resources allocation service of the digital-twin Lijiang River, and a reference for dry-season ecological replenishment of comparable urban and tourism-oriented rivers. |
| Key words: Lijiang River water replenishment ecological and navigational water demand dual-scale operation forecast-warning-simulation-plan workflow short-range water replenishment joint operation of multi-reservoir system |