引用本文:
【打印本页】   【HTML】   【下载PDF全文】   【查看/发表评论】  【EndNote】   【RefMan】   【BibTex】
过刊浏览    高级检索
本文已被:浏览 7次   下载 0次  
浅埋天然块石调控堰塞坝溃决过程的水槽试验研究
余清海1, 周家文2, 廖海梅1, 谭龙金1, 李榕慧1
1.贵州大学 土木工程学院;2.四川大学 水力学与山区河流开发保护国家重点实验室
摘要:
堰塞坝溃决具有突发性强、洪峰流量高和破坏性大等特点,有效延缓溃决过程并降低洪峰流量是堰塞坝应急处置的关键目标之一。本文提出一种将天然块石浅埋于堰塞坝表层的应急处置方法,并通过水槽试验研究了块石粒径和布置位置对溃决过程的调控作用。结果表明,坝顶浅埋布置下,块石粒径是决定调控效果的主控因素。块石粒径达到临界粒径时,溃口表面可形成稳定的抗侵蚀层,洪峰流量较无块石工况降低74.36%,溃决历时显著延长。继续增大块石粒径,洪峰流量的进一步衰减幅度相当有限。块石粒径达到或超过临界粒径时,溃口纵向侵蚀模式由层状侵蚀转变为局部侵蚀与停滞的复合模式,同时改变下游洪水冲击压力响应。块石浅埋在坝顶位置时,其对洪水、溃决过程的调控效果明显优于浅埋在上下游坝坡。此外,基于受力分析提出了块石抗滑稳定系数及临界粒径判别方法。研究成果可为堰塞坝应急处置提供理论依据和工程设计参考。
关键词:  堰塞坝  洪峰流量  溃决历时  溃口演化  块石临界粒径  应急处置
DOI:
分类号:P642
基金项目:国家重点研发计划(2025YFF0520004)
Flume experiments on mitigating the breaching process of landslide dams using shallowly embedded natural boulders
YU Qinghai1, ZHOU Jiawen2, LIAO Haimei1, TAN Longjin1, LI Ronghui1
1.College of Civil Engineering,Guizhou University;2.State Key Laboratory of Hydraulics and Mountain River Engineering,Sichuan University
Abstract:
The breaching of landslide dams is characterized by rapid initiation, high peak discharge, and severe downstream hazards. Effectively delaying the breaching process and reducing the peak discharge are therefore key objectives for emergency mitigation of landslide dams. This study proposes an emergency mitigation measure in which natural boulders are shallowly embedded within the near-surface layer of a landslide dam. A series of flume experiments was conducted to investigate the effects of boulder size and placement position on the breaching process, breach evolution, and downstream flood impact pressure. The experimental results indicate that, under shallow embedment of boulders on the dam crest, boulder size is the dominant factor controlling the mitigation effectiveness and exhibits a pronounced threshold effect. Small boulders are readily transported downstream by flow and cannot remain within the erosion zone. Consequently, they are unable to form a stable and continuous erosion-resistant structure and provide only limited suppression of breach development. As the boulder size increases to the critical range, the resistance of the boulders to hydraulic disturbance increases markedly, allowing them to remain on the breach surface and form a stable erosion-resistant layer that reduces continuous erosion of the dam body. Compared with the boulder-free case, when the boulder size reaches the critical range, the peak discharge is reduced by 74.36% and the breaching duration is significantly prolonged. Further increases in boulder size result in limited additional reduction in peak discharge, indicating a threshold effect followed by saturation. Increasing boulder size also alters the erosion pattern and morphological evolution of the breach. Under the boulder-free condition and with small boulders, the breach is dominated by continuous layered erosion, with the flow continuously incising the breach surface. When the boulder size reaches or exceeds the critical range, the boulders obstruct and redistribute the local flow, thereby disrupting the continuity of erosion. As a result, the longitudinal erosion pattern gradually transitions from continuous layered erosion to a composite pattern of localized erosion and stagnation, while lateral breach enlargement is suppressed. Comparative experiments with different boulder placement positions demonstrate that boulders shallowly embedded on the dam crest provide significantly better control of flood response and breaching behavior than those embedded on the upstream or downstream slopes. This is mainly because crest-embedded boulders can directly interact with the concentrated erosion flow during breach initiation and development, thereby promoting the formation of a stable erosion-resistant structure. Boulder size also significantly affects the downstream flood impact pressure response. Large boulders can reduce downstream flood impact intensity by delaying the breaching process and attenuating the peak discharge, whereas small boulders that are readily mobilized by the flow may be entrained in the high-velocity sediment-laden flow and consequently enhance local impact forces. Based on force analysis, a stability coefficient against sliding for boulders was proposed, and a preliminary method for estimating the critical boulder size was established. The peak flow velocity and longitudinal dam slope obtained from the boulder-free case were adopted as hydraulic and topographic inputs. The calculated critical boulder size was slightly larger than that identified experimentally. This discrepancy mainly arises because the theoretical model does not account for contact, interlocking, and wedging effects among natural boulders; therefore, the resulting estimate is conservative. For practical landslide dams, key parameters such as the peak flow velocity and slope may be obtained from comparable breaching cases or numerical simulations. Together with the dam geometry, material composition, and site-specific boulder properties, these parameters can be used for preliminary selection of the critical boulder size. The stability criterion proposed based on the force analysis of shallowly embedded boulders provides a reasonable interpretation of the experimentally observed threshold behavior of boulder-based mitigation and offers a theoretical basis and engineering reference for emergency mitigation of landslide dams.
Key words:  landslide dam  peak discharge  breach duration  breach evolution  critical boulder size  emergency mitigation
手机扫一扫看