引用本文:郑祖桢,徐雄军,章香雅.秦山核电厂一期海堤原型观测资料分析[J].水利水运工程学报,1997,(3):
【打印本页】   【HTML】   【下载PDF全文】   查看/发表评论  【EndNote】   【RefMan】   【BibTex】
←前一篇|后一篇→ 过刊浏览    高级检索
本文已被:浏览 1015次   下载 0  
分享到: 微信 更多
秦山核电厂一期海堤原型观测资料分析
郑祖桢,徐雄军,章香雅
浙江省钱塘江管理局!杭州,310016
摘要:
1984年1月~1993年6月,秦山核电厂一期海堤的变形、孔隙水压力原型观测资料的整理分析表明,它不仅验证了地质勘查资料和设计的可靠性,还解释了海堤在施工期所采用的各项优化设计的安全合理性。
关键词:  变形,孔隙水压力,原型观测,海堤
DOI:
分类号:TV74
基金项目:
Analysis of prototype observation data on first stage sea bank of Qinshan nuclear power station
Zheng Zuzhen,Xu Xiongjun, Zhang Xiangya
Abstract:
The results of prototype observation of the first stage sea bank of Qinshan nuclear power station on deformation, pore water pressure from January 1984 to June 1993 are presented comprehensively in this paper. Not only verified reliability of the geologic prospecting and design, but also explained safety and rationality of the optimum programming adopted in the construction stage.
Key words:  deformation, pore water pressure, prototype observation, sea bank