引用本文:沈莹.金山咀港区各规划方案的港内泥沙淤积[J].水利水运工程学报,1997,(1):
【打印本页】   【HTML】   【下载PDF全文】   查看/发表评论  【EndNote】   【RefMan】   【BibTex】
←前一篇|后一篇→ 过刊浏览    高级检索
本文已被:浏览 805次   下载 0  
分享到: 微信 更多
金山咀港区各规划方案的港内泥沙淤积
沈莹
南京水利科学研究院河港研究所
摘要:
根据金山咀港区物理模型试验的成果,从各规划方案港区水流形态的变化,讨论了适用于港区各规划方案的淤积计算式,计算了各方案港内泥沙淤积强度、淤积量和淤积分布。结果表明,从港内泥沙淤积角度看,在金山咀地区建港是可行的。
关键词:  泥沙,淤积强度,淤积量,港口,规划方案
DOI:
分类号:TV14
基金项目:
Silt accumulation of each planning scheme for Jinshanzui harbor reach
Shen Ying
Nanjing Hydraulic Research Institute
Abstract:
Based on the test results of physical model for Jinshanzui harbor reach, through the changes of flow pattern within the harbor reach of each planning scheme, computative formulas for siltation suitable to each planning scheme were discussed, the silting intensity, amount of silting and distribution of siltation were computed also. The results expressed that from the point of view of silt accumulation, it is feasible to build harbor at Jinshazui region.
Key words:  silt, silting intensity, amount of silting, horbor, planning scheme
手机扫一扫看