摘要: |
为了有效治理长江南通河段,制定经济、合理的整治工程方案,在南通河段潮汐河工模型上,进行了各整治工程方案的定床和局部动床试验。通过综合分析,提出了稳定南通河段现有河势工程措施和改善现有河势的整治方案。 |
关键词: 河床演变,潮汐模型,工程方案,模型试验 |
DOI: |
分类号:TV131.61 |
基金项目: |
|
Model test study on regulation project in Nantong section of Changjiang River |
Ma Linqing,Yuan Wenzhi,Zhao Xiaodong, Gao Zhengrong
|
Nanjing Hydraulic Research Institute
|
Abstract: |
In order to realign Nantong river section, draw up economic and reasonable regulation works,the tidal river model of Nantong river reach was designed and set up.Fix-bed and partial moving-bed experiments about various regulation projects of this river section were conducted.By comprehensive analyses,engineering measures forstabilizing present Nantong river reach and regulation programs for improving itsexisting river shape were put forward. |
Key words: bed development,tidal model,prefect program, model test |